Figure 4.1.7.2: spindle rotation – Yaskawa PC NC User Manual

Page 188

Advertising
background image

4 - 26

YASNAC PCNC Operating Manual

Chapter 4: Maintenance

(f) Setting for the parameters related to spindle operation is incorrect.

Check the setting for the related parameters.

FIGURE 4.1.7.2: Spindle Rotation

(9) FIN Wait Status after Execution of Spindle Related Commands

If sequence processing is interrupted waiting for a signal, the NC enters the FIN wait status.

(a)Spindle speed agree signal is not input.

If the NC enters this status after the execution of such as “M03 S100” commands, check
whether #311 1 D6 = 1 (waiting for FIN).

Check the I/O signals of #1000s at the I/O section by referring to the ladder chart supplied
by the machine tool builder.

#3110 D0

GR1

#3110 D1

GR2

#3110 D2

GR3

#3110 D3

GR4

Advertising