IMPORTANT — Avoid securing too tightly and disturbing the

inner casing. Do not try to force furnace into a wall opening which

is smaller than specified dimension.

OUTER CASING (Figure 6)

1. Align 1 3/4" slot on casing bracket with bottom screw hole on

inner casing. Attach casing bracket to inner casing with one (1)

10 x 1/2" screws for each casing bracket. Do not completely

tighten screws at this time.

2. Place outer casing onto header.

Attention: Use center clearance hole on outer casing top for

attachment to header with one (1) 8 x 3/8" Phillips screw when

optional blower is not installed.

Attention: Use outside clearance holes on outer casing top for

attachment to header with two (2) 8 x 3/8" Phillips screws when

optional blower is installed.

3. Align clearance holes on outer casing bottom with screw holes

on casing brackets by adjusting slots on casing brackets.

4. Complete tightening casing bracket screws from Step 1 to inner

casing at this time.

5. Attach outer casing to casing brackets with two (2) 10 x 1-1/2"

screws.

INSTALLING CONTROL DOOR

Attach two washers supplied in hardware package to pivot pins

located at bottom of control door. Install control door to outer

casing assembly.