Installing the Switch on a Flat Surface

3-8 Hardware Installation

Figure 3-4 Chassis Bottom, Rubber Feet Placement

Guidelines for Flat Surface Installation

Locate the switch within 152 cm (5 ft) of its power source and on a surface as shown in 

Figure 3‐5

. 

A temperature of between 0°C (32°F) and 40°C (104°F) must be maintained at the 
installation site with fluctuations of less than 10°C (18°F) per hour.

If an optional redundant power system is going to be installed and connected to the 
14‐pin Redundant Power Supply input connector on the rear of the switch,

refer to the 

installation guide shipped with the redundant power system.

1 Bottom of chassis as seen when chassis is

resting on its back

3 Rubber feet with adhesive backing

(four)

2 Locations to install the rubber feet (four locations)

Note: If a number of switches are being installed in a stack, repeat steps 1 through 4 to
install the rubber feet on each switch before continuing with the installation.