Stacking cable connections -12 – Enterasys Networks A2H124-24FX User Manual

Page 40

Advertising
background image

Connecting Stacking Cables

3-12 Hardware Installation

Figure 3‐8

 shows an example of a four‐high stack connected in a closed loop 

configuration. All STACK DOWN and STACK UP connectors are used in the installation. 
The stacking cable connections are from the STACK DOWN connector of one switch to 
the STACK UP connector of the next switch up in the stack. A stacking cable connection 
from the STACK DOWN connector of the switch at the top of the stack to the STACK UP 
connector at the bottom of the stack closes the loop. In a daisy chain configuration, one 
cable connection is not made.

Figure 3-8 Stacking Cable Connections

After connecting the cables to the stacking ports, proceed to “

Configuring Switches in a 

Stack

” on page 3‐13 for instructions.

1

Category 5 or better UTP cable

4

STACK UP connector at top of stack

2

STACK UP connector

5

STACK DOWN connector at bottom of stack

3

STACK DOWN connector

Console

CPU

RPS

MGR

1

3

5

7

9

11 13 15 17 19 21 23

2

4

6

8

10 12 14 16 18 20 22 24

25

26

27

28

25/Up

26/Down

Stack

27

28

Console

CPU

RPS

MGR

1

3

5

7

9

11 13 15 17 19 21 23

2

4

6

8

10 12 14 16 18 20 22 24

25

26

27

28

25/Up

26/Down

Stack

27

28

Console

CPU

RPS

MGR

1

3

5

7

9

11 13 15 17 19 21 23

2

4

6

8

10 12 14 16 18 20 22 24

25

26

27

28

25/Up

26/Down

Stack

27

28

Console

CPU

RPS

MGR

1

3

5

7

9

11 13 15 17 19 21 23

2

4

6

8

10 12 14 16 18 20 22 24

25

26

27

28

25/Up

26/Down

Stack

27

28

А

А

А

Б

Б

Б

Д

В

В

В

Г

2

8

10

12

4

6

1

7

9

11

3

5

13

19

21

23

15

17

14

20

22

24

16

18

2

8

10

12

4

6

1

7

9

11

3

5

13

19

21

23

15

17

14

20

22

24

16

18

2

8

10

12

4

6

1

7

9

11

3

5

13

19

21

23

15

17

14

20

22

24

16

18

2

8

10

12

4

6

1

7

9

11

3

5

13

19

21

23

15

17

14

20

22

24

16

18

Advertising