Stack initialization overview, Stack initialization overview -19 – Enterasys Networks A2H124-24FX User Manual

Page 47

Advertising
background image

Connecting AC and RPS-SYS Power

SecureStack A2 Installation Guide 3-19

Stack Initialization Overview

When you install and connect all the stacking cables to the switches in the stack before 
applying power to the switches, the following occurs:

The switch that will manage (Manager) the stack is automatically established with all 
other switches established as Member switches in the stack. When the switches 
complete their initializations, one of the switches in the stack will illuminate its 
Manager LED, indicating that it is the stack Manager. The Manager LED on each 
Member switch will be off.

The hierarchy of the switches that will function as backup Manager is also determined 
in case the current Manager malfunctions, is powered down, or is disconnected from 
the stack.

The Console port on each Member switch will provide only the unit number. Only the 
Console port on the Manager switch is active and provide a CLI for out‐of band 
configuration to set the IP address, password, and other settings.

Once you know which switch is the Manager, proceed to 

Connecting to Console Port for 

Local Management

” on page 3‐20.

Advertising