Step 4

Wiring

Hazardous area installations

If you are installing the sensor in a hazardous location, verify that the hazardous classification information
printed on the sensor tag matches the environment in which the sensor will be installed.

Improperly sealed housings can expose electronics to moisture, which can cause measurement error
or flowmeter failure. Inspect and grease all gaskets and O-rings. Fully close and tighten all housing
covers and conduit openings.

Installation options

The sensor has one of the following configurations:

• An integral Model 2400S (all models) or Model 1700/2700 transmitter (high-temperature and extreme

high-temperature models only). No wiring is required between the sensor and the transmitter. Skip to
Grounding on page 20.

• A core processor to a 4-wire remote transmitter (requires 4-wire cable); see Core processor to a 4-wire

remote transmitter on page 16.

• A core processor to a remote host (requires 4-wire cable); refer to the Micro Motion MVD

Direct

Connect

Meters Installation Manual.

• A junction box to a 9-wire remote transmitter or remote core processor (requires 9-wire cable); see

Junction box to a 9-wire remote transmitter or remote core processor on page 19.

Core processor to a 4-wire remote transmitter

Follow the steps below to connect the 4-wire cable between the core processor and the transmitter.

1. Use one of the following methods to shield the wiring from the core processor to the transmitter:

• If you are installing unshielded wiring in continuous metallic conduit that provides 360°

termination shielding for the enclosed wiring, go to page 18 (step 6 of the wiring procedure).

• If you are installing a user-supplied cable gland with shielded cable or armored cable, terminate

the shields in the cable gland. Terminate both the armored braid and the shield drain wires in the
cable gland. Never connect the drain wires to the internal ground screw of the core processor. Go
to page 18 (step 6 of the wiring procedure).

• If you are installing a Micro Motion-supplied cable gland at the core processor housing:

- Prepare the cable and apply shielded heat shrink as described below. The shielded heat shrink

provides a shield termination suitable for use in the gland when using cable whose shield
consists of foil and not a braid. Proceed to step 2 of the wiring procedure, below.

- With armored cable, where the shield consists of braid, prepare the cable as described below,

but do not apply heat shrink. Proceed to step 2 of the wiring procedure, below.

2. Remove the cover from the core processor housing.

3. Slide the gland nut and the clamping insert over the cable.