Venting, 8 installing through the ceiling, Minimum flue vent configuration – Harman Stove Company P43 User Manual

Page 13

Advertising
background image

13

P43 Pellet Stove

#8 installing through the ceiling

Through the ceiling vent, follow PLvent

manufacturers recommendations when using wall

and ceiling pass through.

note: do not place joints

within wall pass-throughs.

Fig. 14

PL vent manufacturer's

firestop spacer and

support

(See Page 6 for

corner installation

clearances)

Minimum flue vent

configuration

It is recommended that outside

air be installed with this venting

configuration to reduce smoke

and creosote smell in the room

in the event of power failure.

Min. above ground level

18"

Storm collar

Flashing

3" min.

3" min.

1" min.

3" min.

venting

Fig. 15

3" min.

No insulation or

other combustible

m a t e r i a l s a r e

a l l o w e d w i t h i n

3" of the pellet

vent pipe. Unless

specified by the

pipe manufacturer

12" min. wall to outlet

36" min clearance to any

combustible material

Fig. 16

Advertising