• Drill a hole or drive a nail through this center point.

• Check the floor above for any obstructions, such

as wiring or plumbing runs.

• Reposition the heater and flue system, if neces-

sary, to accommodate the ceiling joists and/or
obstructions.

• Cut an 11-inch X 11-inch (280 mm X 280 mm)

hole through the ceiling, using the center point
previously marked.

• Frame the hole with framing lumber the same

size as the ceiling joists.

Figure 16 Hole and New Framing Members

If the area above the ceiling is NOT an attic, position
and secure the ceiling firestop on the ceiling side of
the previously cut and framed hole.

Figure 17 Ceiling Firestop (Ceiling Side)

If the area above the ceiling IS an attic, position and
secure the firestop on top of the previously framed
hole.

Figure 18 Attic Firestop

C. Flue Termination

For Horizontal Terminations - To attach and secure
the termination to the last section of horizontal flue:

• Rotate and interlock the ends as described at the

beginning of the Installing Flue Components sec-
tion.

• The termination kit should pass through the wall

firestops from the exterior of the building.

• Adjust the termination cap to its final exterior po-

sition on the building.

WARNING: THE TERMINATION CAP
MUST BE POSITIONED SO THAT
THE ARROW IS POINTING UP.

• Use the exterior pipelock hole provided on the

round flange of the wall firestop to secure the flue
pipe in place.

• Use a high-temperature sealant or fiberglass rope

gasket to seal between the pipe and exterior
firestop.

• See Figure 4 for flue termination clearances.

JOIST

CEILING FIRESTOP

CEILING

NAILS (4 REQUIRED)

CHIMNEY

HOLE

11”

(280mm)

11”

(280mm)

CEILING

NEW

FRAMING

MEMBERS

EXISTING

CEILING

JOISTS

CEILING

CEILING FIRESTOP

RAFTER

NAILS (4 REQUIRED)