2 after fryers are under the fry station hood, 3 power requirements – Frymaster BIH series User Manual

Page 9

Advertising
background image

2–2

2.2

After Fryers Are Under The Fry Station Hood

Adjust casters so that fryers are level and at the proper height in the fry station hood. If necessary,
level the fryer(s) by loosening the locking screw on the caster leg and screwing the caster in or out.
When fryer is level and at proper height, retighten the locking screw on the caster leg.

Secure the fryer in place under the hood with the restraining hardware installed with the hood.

2.3

Power Requirements

DANGER

Copper wire suitable for at least 167°F (75°C)

MUST

MUST

MUST

MUST be used for power connections.

MODEL

VOLTAGE PHASE

WIRE

SERVICE

MIN.

SIZE

AWG

(mm2)

AMPS PER LEG

L1 L2 L3

H14

208

3

3

6

(16)

39

39

39

H14

240

3

3

6

(16)

34

34

34

H14

480

3

3

8

(10)

17

17

17

H14

220/380

3

4

6

(16)

21

21

21

H14

240/415

3

4

6

(16)

20

20

21

H14

230/400

3

4

6

(16)

21

21

21

ALL

208

3

3

6

(16)

39

39

39

14 SERIES

240

3

3

6

(16)

34

34

34

EPRI

220/380

3

4

6

(16)

21

21

21

UNITS

240/415

3

4

6

(16)

20

20

20

DANGER

The electrical power supply for this appliance

MUST

MUST

MUST

MUST be the same as indicated on

the rating and serial number plate located on the inside of the fryer door.

DANGER

This appliance

MUST

MUST

MUST

MUST be connected to the voltage and phase as specified on the

rating and serial-number plate located on the inside of the fryer door.

DANGER

All wiring connections for this appliance

MUST

MUST

MUST

MUST be made in accordance with the

wiring diagrams furnished with the equipment. Wiring diagrams are located on the

inside of the fryer door.

Advertising
This manual is related to the following products: