Furuno FELCOM 16 User Manual

Page 29

Advertising
background image

1. OPERATIONAL OVERVIEW

1-9

TEST-DISTRESS ALERT

Sending test distress alert to LES

WAITING FOR ACTIVATION

Waiting start of PV test

WAITING FOR TEST RESULT

Waiting for results of PV test

CLEARING

Clearing PV test

PV TEST is Completed.

PV test is completed.

PV TEST Failure.

PV test failed.

(3b) RF CON board program version number

DCE F16 Ver. XX (XX = Version Number)

(4) Frame synchronization

Blank

Changing channel, or during transmission

SYNC (NCS)

Synchronizing with NCS

SYNC (LES)

Synchronizing with LES

MES Sig. Ch

Transferring to MES signaling channel

MES Msg. Ch

Transferring to MES message channel

UNSYNC

Out of synchronization

Retuning

Synchronizing with NCS or LES


(5) Ocean region receiving

No display

Out of synch with satellite

AOR-W Atlantic

Ocean

Region-West

AOR-E Atlantic

Ocean

Region-East

IOR

Indian Ocean Region

POR Pacific

Ocean

Region


(6) Logging status

LOGOUT

Logged out with ocean region

LOGIN

Logged in with ocean region

LOGIN (Flashing)

Logging in with ocean region

Advertising