Frymaster BID80 Series User Manual

Page 28

Advertising
background image

BID80 SERIES GAS FRYERS

CHAPTER 5: BUILT-IN FILTRATION

5-6

5.2.2 Installing the Filter

Slide the filter inside the fryer cabinet. Ensure
the male-female slip-fitting coupling is fully
engaged.

5.3 Daily Filtration Operation

DANGER

Use caution and wear proper protective clothing. The oil to be filtered is at or near

350°F (177°C). Ensure all hoses are connected properly and drain handles are in

their proper position prior to operating any switches or valves. Failure to do this can

result in severe burns.

NOTICE

Drawings and photos used in this manual are intended to illustrate operational,

cleaning and technical procedures and may not conform to on-site management

operational procedures.

5.3.1 General Overview

The filter pump is turned on only after the shortening/oil is brought to operating temperature and
drained into the prepared filter pan. The filter motor is then engaged and oil is drawn through filter
paper and pumped back into the frypot. The frypot’s drain remains open during the filtering process.
Allow the oil to cycle through the filter paper for approximately 5 minutes. At the end of 5 minutes,
close the drain valve and allow the pump to fill the frypot to the top OIL LEVEL line. Leave the
pump running for 10-15 seconds after bubbles appear in the frypot to ensure all shortening/oil is
pumped from the drain pan and the lines.

The filter pan slides under the fryer (left),
connecting with a slip fitting (right). Slip fitting
location will vary (above or to the side of the
filter pan), according to fryer system.

Advertising