Furuno NAVNET 1933C-BB User Manual

Page 34

Advertising
background image

1-24

Connecting the signal cable

Only the signal cable runs from the processor unit (1953C-BB: power supply unit) to the
antenna unit. In order to minimize the chance of picking up electrical interference, avoid
where possible routing the signal cable near other onboard electrical equipment. Also, avoid
running the cable in parallel with power cables. Pass the cable through the hole and apply
sealing compound around the hole for waterproofing.

1. Open the antenna cover by loosening four scanner bolts, and then fix the stay.

Stay

Cable gland

Scanner
Bolt

Antenna unit chassis, cover opened


2. Unfasten the cable gland assembly (plate, gasket, flat washer).
3. Pass the signal cable with connector through the bottom of the antenna unit chassis.

Pass the cable through the gland assembly as shown below.

Plate

Bolt

4-M4X16

Gasket

Flat
washer

Passing the signal cable through the cable gland assembly


4. Fasten the crimp-on lug on the shield to one of the fixing bolts of the cable gland

assembly.

5. Position the signal cable so that no more than 4 cm of the sheath is exposed as shown

in the figure at the top of the next page. Tighten fixing bolts.

Advertising
This manual is related to the following products: