Installation – FMI VCM-36Q User Manual

Page 14

Advertising
background image

www.fmiproducts.com

122275-01G

14

Figure 13 - Installing Gas Line and

Equipment Shutoff Valve (Model May

Vary From Illustration)

INSTALLING GAS LINE

WARNING: A qualified ser-

vice person must connect heater

to gas supply. Follow all local

codes.

IMPORTANT: See Connecting to Gas Supply

in your log set owner’s manual for details on

gas hookup.
You may run the gas line from either side of

the firebox (see Figure 13). Decide which side

you want to run the gas line from.
Note: This is one option for installing shutoff

valve. Check local codes for equipment shut-

off valve location requirements.

BRICK PANEL INSTALLATION

IMPORTANT: Installation of brick

should be done after the fire-

place is placed in a permanent

location.

The brick housings are already installed on

the panels. When installing brick housing

panels into fireplace, wear gloves as edges

may be sharp.
1. Beginning with left side panel, place

panel, bottom edge first, at an angle into

fireplace. Secure to bottom of fireplace

with screws provided.

2. Install right side as left side in step 1 using

screws provided.

3. Install back panel and secure back to

sides and bottom of firebox with screws

provided.

4. Using self-tapping screws and a drill, place

screws into large holes in back and side

panels (see Parts, page 30), through wire

mesh and into firebox wrapper to secure.

Figure 14 - Hole in Side Panel to Attach

to Firebox Wrapper

Hole in

Side Panel

Figure 15 - Installing Bricks into Brick

Housings

INsTAllATIoN

Continued

BRICK INSTALLATION

Each brick housing is stamped with a number

(full size bricks are not stamped). These num-

bers will help identify bricks when installing. It

is important to install these bricks exactly as

instructed. Press brick firmly into brick housing

until it snaps. Groove line on side of brick will

come in contact with flange on brick housing.

This secures brick into housing (see Figure

15). Smaller bricks may require a small portion

of furnace cement applied to back of brick to

secure it until grouting has been completed.
Bricks are packaged in separate boxes. Brick

matrixes on pages 15 through 27 show how

bricks are packaged and placed for each

size fireplace and the number of bricks per

box. There are 2 extra full bricks included in

hearth brick package.
Install bricks one section at a time starting with

hearth panel followed by rear panel, left panel

and right panel. It is important to install bricks

in sequence. Please note, full size bricks are

NOT stamped.

Gas Line Hole

Equipment

Shutoff Valves

(Install One)

Advertising
This manual is related to the following products: