23/38 Installation

Guide

SG Series 225 & 300 kVA

3.8.2 Power

connection

with common input utility

S

G

S

_

22

5-

30

0_

UPS

con

ne

ct

ion

common_GE_01US

N

L3

L2

L1

LO

AD

PE Load

PE

Input rectifier

1 -

IN

PU

T

RE

CT

IF

IE

R

Position of the PE compression lugs in case

the cable input is from the bottom of the UPS

Input rectifier

PE

PE Load

N

L3-1

L2-1

L1-1

Fig. 3.8.2-1 Power connections Common Input Utility


Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

Neutral (Bypass)

PE

Ground


Output Load

L1

Load Phase A L2

Load Phase B L3

Load Phase C

N

Neutral

PE

Ground



Bus bars BR1, BR2 and BR3 must remain connected.
Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for input/output and DC power connections on Bus Bars: Section 3.8.1.