Installation

Guide

SG Series 225 & 300 kVA

3.11 CONTROL BUS CABLE LOCATION

Warning!
This installation must be verified by trained personnel before the initial start-up
(ensure that the UPS installation is completely powered down).

S

G

S

_2

25-

300

_R

P

A

con

tr

ol b

us

c

able_01

Q1

Q2

A

2

4

3

1

3

4

2

1

Fig. 3.11-1 View electronic module on intermediate unit

Access to the control bus
connection.

The control bus connection
between parallel units must be
made on the front of the
electronic module fitted
behind the front doors.

To properly route the control
bus cables the safety screen
A” must be removed.

SG

T5

000_

100-15

0_RPA cont

rol

bu

s c

able

_

02

US

Next parallel unit

JB2

JB1

JA2

JA1

A

A

JA

JB

Fig. 3.11-2 Front view electronic module on intermediate unit

Control bus cables connection.

Plug the cables JA (1/2/3/4/5/6/7)
and JB (1/2/3/4/5/6/7) onto the RJ
connectors JA and JB located on
parallel bus PCB P34 – Bus
Interface IM0048
(going to “P13 –
RPA Board IM0006”
J52(A) and
J62(B)).

Fix both cables JA (1/2/3/4/5/6/7)
and JB (1/2/3/4/5/6/7) to parallel bus
socket connecting the cable shield to
ground by means the cable clamps
A“.