Installation

Guide

SG Series 225 & 300 kVA

3.8.4 Battery

connection

Q1

Q2

4

3

2

1

2

3
4

1

BATTERY

PE

_

+

SG

S

_

225

-30

0_

UPS

co

nne

cti

on

ba

tter

y_

01US

Fig. 3.8.4-1 Power connections Battery


Battery

+

Positive pole of the Battery

Negative pole of the Battery

Do not insert the Battery Fuses before the commissioning.



Battery Cable Terminations are to the Positive and Negative Terminals as shown above.

Connect wire to the Lugs using appropriate tools and appropriate torque.

Torque specification for Input/Output and DC power connections on Bus Bars: See section 3.8.1.