Installation

Guide

SG Series 225 & 300 kVA

3.8.3 Power connection separate input utility

S

G

S

_2

2

5-

30

0

_U

P

S c

o

n

ne

ct

ion

separ

ate_

GE_01US

PE Load

PE

Input rectifier

Position of the PE compression lugs in case

the cable input is from the bottom of the UPS

Input rectifier

PE

PE Load

L1-2

L2-2

L3-2

2

- I

N

PU

T

BY

PAS

S

1 -

IN

PU

T

RE

CT

IF

IE

R

N

L3-1

L2-1

L1-1

L3

L2

L1

LO

AD

N

Fig. 3.8.3-1 Power connections Separate Input Utility

Separate Input Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

N

Neutral (Bypass)

PE

Ground

The interconnection links BR1, BR2 and BR3 must be removed (see Fig. 3.8.3-2).


Output Load

L1

Load Phase A L2

Load Phase B L3

Load Phase C

N

Neutral

PE Ground



Bus bars BR1, BR2 and BR3 must be removed.
Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: Section 3.8.1.