Installation instructions, Site requirements – Stovax PR0919 User Manual

Page 12

Advertising
background image

12

STUDIO 1 BF

1A

AR1671

STUDIO 2 BF

1A

AR1971

Start of bend to centre line of horizontal flue 170mm.

Centre line of vertical flue to end of bend 220mm.

2.1 TOP FLUE UP & OUT kIT

STUDIO 1 BF (8534/8534AN)

Vertical from the top of the appliance then horizontally out.

(See Diagram 1A). The basic kit comprises:

1 x 200mm vertical length

1 x 500mm terminal length (cut to length on site)

1 x 90° elbow

1 x wall plate

1 x 70mm restrictor

1 x 60mm restrictor

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

STUDIO 2 BF (8509/8509AN)

1 x 200mm vertical length

1 x 500mm vertical length

1 x 500mm terminal length (cut to length on site)

1 x 90° elbow

1 x wall plate

1 x 75mm restrictor

The kit may be used on its own. (Note – STUDIO 1 BF with

a 200mm rise only the 500mm terminal length can be

used). Extra lengths may be added to the vertical and

horizontal from the list below.

1B

AR1672

When A = 1.0 to 1.499 metes B & C = 1.0 metres

maximum

When A = 1.499 metres to 3.0 metres B & C = 4.0

metres maximum

2.2 TOP FLUE UP & OUT WITH ADDITIONAL

BEND

Any additional bend may be used on the horizontal section

(either 45° or 90°), but the overall horizontal flue run will

be reduced. Refer to Diagram 1B.

2. FLUE OPTIONS

Advertising