Installation instructions, Installation, Flue assembly – Stovax PR0919 User Manual

Page 17

Advertising
background image

17

INSTALLATION INSTRUCTIONS

INSTALLATION

13

AR1905

3.3 STUD WORk INSTALLATION METHOD 2 (EDGE)

For this cool-wall Edge installation, the convected heat of

the fire is channelled into the chimney cavity and vented at

the top.

There is an optional Studio Edge Fixing Kit available for

installing the fire without a frame. STUDIO 1BF CODE No.

8727BFFK01 STUDIO 2BF CODE No. 8727BFFK02

Using the fixing kit:

• Fit the two side and bottom channels to the front flange

of the fire, Diagram 14. There is a deliberate gap at the top

for convected heat

14

AR1912

This now determines the width of your two vertical stud

work supports. The kit has been designed so that

plasterboard can be taken to the three channels, Diagram

14A

14a

AR1934

• Fix the edge of the vertical support to the edge of the

channel

Build the stud work chimney breast to the desired size:

• Ensure all clearances to combustible material are

maintained, 3.1 above

• Decide on flue requirements

• Cut a hole for the flue exit - see Installation Instructions,

Section 2, 2.5.

15

AR1902

• Fit non-combustible board to the stud work above the

fire. This should extend a minimum of 400m above the

appliance.

• Fit plasterboard to the remaining chimney breast front

• Decide on the position for the wall box containing the

batteries and wall switch

• Mount it into the stud work chimney breast connecting

up the wires from the fire, see Stud work Installation with

Frame for wiring detail on previous page

• Connect the flue system and gas services using the

opening in the side of the chimney breast for access.

After commissioning, finish the sides of the chimney breast,

Diagram 16

16

AR1911

The top of the chimney breast must have a minimum

200mm2 vent.

• Apply a plaster finish to the chimney breast

4. FLUE ASSEMBLY

4.1 Two types of flue terminals are available, horizontal and

vertical. To measure for a horizontal terminal:

• Decide on the terminal position

• Measure the height from the top of the appliance to the

centre of the required outlet.

For minimum and maximum flue dimensions see Diagram

17A / 17B.

Advertising