Ductwork, wiring locations, Step 1, install framing for hood support, Important – GE MONOGRAM ZV900 User Manual

Page 16: Install framing for hood support

Advertising
background image

15

Installation Instructions

INSTALLATION—RECIRCULATING

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.
Locate the template packed with the literature.
Measure 36

from the floor to the top of the cooking

surface. Add hood installation height determined on
page 7. Mark that location.

Tape the template in position along the penciled line.

CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Use a level to draw a line straight up, from the

centerline on the template to the ceiling.

HOUSE WIRING LOCATION:

The junction box is located on the top left side of

the hood.

Wiring should enter the back wall at least 22

above the bottom of the hood, and within 6

of the centerline.

INSTALL FRAMING FOR HOOD
SUPPORT

IMPORTANT:

Framing must be capable of

supporting 100 lbs.

If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs

at the bracket location indicated on the template.

Install a horizontal support at least 1

x 6

between two wall studs at the bottom mounting
bracket installation location. The horizontal support
must be flush with the room side of the studs.
Use cleats behind both sides of the support to
secure to wall studs.

Reinstall drywall.

1

Centerline of
Installation
Space

8" Min. Opening for Ductwork

View From Rear

Cleats

1" x 6" Min.

Mounting

Support

Centerline of

installation

space

View from rear

cleats

1” x 6” min.

mounting

support

Ceiling

Advertising