Service clearances, Model erch-hp energy recovery unit – Greenheck Fan Energy Recovery Ventilator with Heat Pump 473501 User Manual

Page 8

Advertising
background image

8

Model ERCH-HP Energy Recovery Unit

Service Clearances

Minimum clearances are required for access on all sides for routine maintenance. Filter replacement, drain pan
inspection and cleaning, energy wheel cassette inspection, fan bearing lubrication and belt adjustment are examples
of routine maintenance that must be performed. Blower and motor assemblies, energy wheel cassette, coil and filter
sections are always provided with a service door or panel for proper component access. Clearances for component
removal may be greater than the service clearances, refer to drawings for these dimensions.

ERCH-HP 20
ERCH-HP 45

ERCH-HP 55
ERCH-HP 90

Clearances for service and component removal on ERCH-HP 20 and ERCH-HP 45
* Clearance for energy wheel removal on ERCH-HP 20
** Clearance for energy wheel removal on ERCH-HP 45

Clearances for service and component removal on ERCH-HP 55 and ERCH-HP 90

WHEEL CASSETTE

COIL SECTION

ACCESS P

ANEL

ACCESS P

ANEL

ACCESS PANEL

ACCESS P

ANEL

ACCESS PANEL

ACCESS P

ANEL

ACCESS PANEL

EXHAUST

HOOD

OUTDOOR AIR

HOOD

INTAKE

EXHAUST AIR

ELECTRICAL BOX

FIL

TERS

FIL

TERS

ACCESS PANEL

IG HEA

TER

CLEARANCE

WITH IG HEATER

MINIMUM

36 IN

36 IN

*48 IN

**64 IN

52 IN

36 IN

WHEEL CASSETTE

COIL SECTION

ACCESS P

ANEL

ACCESS P

ANEL

ACCESS PANEL

ACCESS P

ANEL

ACCESS PANEL

ACCESS P

ANEL

ACCESS PANEL

EXHAUST

HOOD

OUTDOOR AIR

HOOD

INTAKE

EXHAUST AIR

ELECTRICAL BOX

FIL

TERS

FIL

TERS

ACCESS PANEL

IG HEA

TER

CLEARANCE

WITH IG HEATER

MINIMUM

42 IN

42 IN

36 IN

42 IN

52 IN

Advertising