Installation instructions, Commissioning – Stovax Ceramica Manhattan Wood Stove User Manual

Page 19

Advertising
background image

1. COMMISSIONING

1.1 Having run the gas supply to the stove, PURGE THE SUPPLY

PIPE, this is essential to expel any debris that may block the

gas controls. Connect the gas supply to the 8mm

compression elbow at the RH rear corner of the stove, see

diagram 1.

1.2 Connect a suitable pressure gauge to the test point located

on the inlet fitting, and turn the gas supply on. Light the

appliance and check all gas joints for possible leaks. Turn the

appliance to maximum and check that the supply pressure is

as stated on the data badge. Turn the gas off and replace the

test point screw, turn the gas on and check the test point for

leaks.

1.3 Check that the installation instructions and any local

regulations are complied with. Check that all seals are in

good condition. Complete the Appliance Commissioning

Checklist at the front of these Instructions. Explain the

operation of the appliance to the end user.
Hand the completed instructions to the User for safe

keeping, as the information will be required when making

any guarantee claims.

19

INSTALLATION INSTRUCTIONS

COMMISSIONING

AR0934

1

Advertising