Installation instructions, Troubleshooting checklist, Replace wiring cover – GE JV635 User Manual

Page 14: 14 secure hood, Follow electrical code, Connect wiring, Install light bulbs, Connect ductwork to hood, Replace filters

Advertising
background image

TROUBLESHOOTING CHECKLIST

If the hood seems to be operating at high speed when
the control is not set on high, or if ventilation seems
inadequate, check the following:
❏ Knockouts not removed from hood.
❏ Damper blade not opening.
❏ Reduced airflow because the duct is too small or

the duct length is too long.

❏ The duct is blocked.
❏ Undersized or restrictive wall or roof cap.

REPLACE WIRING COVER

On models so equipped, replace the wiring cover
or the bottom cover.

14

SECURE HOOD

Slide the hood back against the wall. Tighten
the mounting screws. Be sure the screw heads
are in the narrow neck of the keyhole slot.

Keyhole (4)

Mounting
screw (4)

NOTE:

DO NOT PUSH ON FAN BLADE. Pushing

on the blade may cause it to interfere with other
hood parts.

FOLLOW ELECTRICAL CODE

Complete the electrical wiring according to
National Electrical Code and local codes.
NOTE:

This hood must be permanently grounded.

Connect house wiring (120 VAC) to hood wiring.

CONNECT WIRING

Connect house black to hood black wire, house
white to hood white wire, and house ground under
green ground screw

. Securely tighten the strain

relief clamp onto the house wiring.

Green ground screw

18

21

22

23

24

INSTALL LIGHT BULBS

Purchase and install two PAR20, 50 W maximum
halogen bulbs

.

20

CONNECT DUCTWORK TO

HOOD

Use duct tape to make joints secure and air tight.

Duct tape

19

REPLACE FILTERS

Make sure fan blade turns freely. The installation is
complete. Turn on power at service panel, and test
for proper operation.

Installation Instructions

Advertising
This manual is related to the following products: