Assembly – Great Dane C5 Chariot GCKH2352S User Manual

Page 50

Advertising
background image

Assembly - 48

ASSEMBLY

Assembly

Bag of Parts

Prepare for Assembly

• Remove machine from the shipping crate:

• Remove box containing operator seat.

• Cut plastic tie straps fastening the front wheels to the shipping crate.

• Cut plastic tie straps holding the discharge chute up.

• Cut plastic tie straps securing the motion control levers to the
machine.

Check Fluid Levels

NOTE: Refer to the Service sections of the operator’s manual for
information regarding check locations and proper fluid levels.

• Check engine oil level.

• Check hydraulic oil level.

Check Tire Pressure

1.Check tires for damage.

2.Check tire pressure with an accurate gauge.

3.Add or remove air, if necessary.

Install ROPS

1.Support rear of bumper with wooden blocks or jack.

2.Loosen nut (A) securing the rear battery hold-down rod and disengage
hooked end (B) from bumper.

3.Remove all bumper mounting bolts and retaining hardware except for
the lower left cap screw (C) at each side of the machine. Discard any
assembly washers, retain bolts and locknuts for later use.

4.Fold ROPS to the upright operating position and install lock pins (D) and
spring pins (E).

Qty.

Description

1

Key

1

Operator’s Manual

1

PDR Check List

CAUTION: Avoid injury! Explosive separation of tire and rim
parts is possible when they are serviced incorrectly:

•Do not attempt to mount a tire without the proper
equipment and experience to perform the job.

•Do not inflate the tires above the recommended
pressure.

•Do not weld or heat a wheel and tire assembly. Heat can
cause an increase in air pressure resulting in an
explosion. Welding can structurally weaken or deform
the wheel.

•Do not stand in front or over the tire assembly when
inflating. Use a clip-on chuck and extension hose long
enough to allow you to stand to one side.

Advertising