GE E4LE User Manual

Page 11

Advertising
background image

Figure 2.1

Three-Phase

Allen Bradley Motor Starter

2.9

Machine Control

2.9.1

Economy Model

To remotely control the Economy Model (ECN) with float switches and/or pre-
treatment lockout, remove the jumper between terminals 4 and 5 and wire in
the float switches or pretreatment components in series. After all field wiring
is complete and complies with local and national electrical codes, move onto
Section 2.10 (Pretreatment for Water Purification).

NOTE:

External control contacts are normally closed, dry contacts.

2.9.2

Deluxe Model

To remotely control the Deluxe Model (DLX), with float switches and/or pre-
treatment lockout, remove the jumper between terminals 2 and 3 and wire in
the float switches and pretreatment in series. After all field wiring is complete

6

Advertising
This manual is related to the following products:

EZ4, E4