GE E4LE User Manual

Page 6

Advertising
background image

1

2.0

INSTALLATION

2.1

Mounting the Unit

When installing your new GE Infrastructure Water & Process Technologies reverse
osmosis (RO) machine, allow at least 45-inches (114 cm) above the machine for mem-
brane element removal and loading. If space is not available, the entire membrane
element housing can be removed for membrane element change outs. If the mem-
brane element housings are to be removed to change out the membrane elements,
at least 6-inches (15.2 cm) is required at the end of each membrane element housing
and 24-inches (61 cm) behind the machine.

2.2

Plumbing

The feed water source must be able to provide water quantity and pressures to main-

tain an operating feed water pressure of 30 - 60 psig (2.1 - 4.1 barg). If the feed water
pressure with the machine is in excess of 60 psig (4.1 barg) or fluctuates by more than
5 psig (0.34 barg) a pressure regulator should be installed up stream of the machine
Inlet. If proper water pressure cannot be maintained to the RO, a booster pump may
need to be installed in front of the pretreatment to provide the proper water quantity
and pressure for the operation of the machine.

Table 2.1

Connections

*

Low Energy Membrane Elements

INLET

inches (cm)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

E4/EZ4/E4LE*

MACHINE

2200

4400

6600

8800

11000

13200

PERMEATE

inches (cm)

0.50 (1.27)

0.50 (1.27)

0.50 (1.27)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

CONCENTRATE

inches (cm)

0.50 (1.27)

0.50 (1.27)

0.50 (1.27)

0.75 (1.90)

0.75 (1.90)

0.75 (1.90)

Advertising
This manual is related to the following products:

EZ4, E4