GE MULTILINK ML1200 User Manual

Page 207

Advertising
background image

CHAPTER 12: SPANNING TREE PROTOCOL (STP)

SPANNING TREE PROTOCOL (STP)

MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL

12–11

Configuring STP parameters (continued)

ML1200(stp)##

port port=1 status=enable

Successfully set the STP status for port 1

R-2S(stp)##

show stp ports

STP Port Configuration

-------------------------------------------------------------------------------

Port# Type Priority Path Cost State Des. Bridge Des. Port

-------------------------------------------------------------------------------

01 TP(10/100) 128 100 Forwarding 80:00:00:20:06:2b:e1:54 80:01

02 TP(10/100) 20 20 Forwarding 80:00:00:20:06:2b:e1:54 80:02

03 100MB Fiber 128 100 Disabled 80:00:00:20:06:2b:e1:54 80:03

04 100MB Fiber 128 100 Disabled 80:00:00:20:06:2b:e1:54 80:04

05 100MB Fiber 128 100 Disabled 80:00:00:20:06:2b:e1:54 80:05

06 100MB Fiber 128 100 Disabled 80:00:00:20:06:2b:e1:54 80:06

07 TP(10/100) 128 100 Disabled 80:00:00:20:06:2b:e1:54 80:07

ML1200(stp)##

show stp config

STP CONFIGURATION

-----------------

Spanning Tree Enabled(Global) : YES

Spanning Tree Enabled(Ports) : YES, 1,2,3,4,5,6,7

Protocol : Normal STP

Bridge ID : 80:00:00:20:06:2b:e1:54

Bridge Priority : 15535

Bridge Forward Delay : 15

Bridge Hello Time : 2

Bridge Max Age : 20

Root Port : 0

Root Path Cost : 0

Designated Root : 80:00:00:20:06:2b:e1:54

Designated Root Priority : 15535

Root Bridge Forward Delay : 15

Root Bridge Hello Time : 2

Root Bridge Max Age : 20

The age parameter is out of range as
per the IEEE 802.1d specifications.

Advertising