B.5 ul requirements for dc-powered units – GE MULTILINK ML1200 User Manual

Page 336

Advertising
background image

B–6

MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL

DC POWER INPUT

CHAPTER B: DC POWER INPUT

B.5

UL Requirements for DC-powered units

48VDC products shall be installed with a readily accessible disconnect device in the
building installation supply circuit to the product.

1.

Minimum 18AWG cable for connection to a Centralized DC power source.

2.

Minimum 14AWG cable for connection to a earth wiring.

3.

Use only with Listed 10 A circuit breaker provided in building installation.

4.

“Complies with FDA radiation performance standards, 21 CFR subchapter J.”
or equivalent.

5.

Fastening torque of the lugs on the terminal block: 9 inch-pound max.

6.

To secure a centralized DC Power Source cable , use at least four cable ties to
secure the cable to the rack at least 4 inches apart, with the first one located
within 6 inches of the terminal block.

Advertising