5. connecting work clamp and gas/air supply, 6. electrical service guide – Miller Electric UPC 838 User Manual

Page 19

Advertising
background image

OM-202 515 Page 15

4-5. Connecting Work Clamp And Gas/Air Supply

Ref. 803 640-A / 802 803-A

1

Work Clamp

2

Workpiece

Connect work clamp to a clean,

paint-free location on workpiece, as

close to cutting area as possible.

.

Use only clean, dry air with 90
to 150 psi pressure.

3

Gas/Air Inlet Opening

4

Hose

5

Teflon Tape

Obtain hose with 3/8 in (9.5 mm) or

larger diameter and 1/4 NPT right-

hand thread fitting. Wrap threads

with teflon tape (optional) or apply

pipe sealant, and install fitting in

opening. Route hose to gas/air

supply.
Adjust gas/air pressure according

to Section 5-2.

Tools Needed:

5/8, 1-1/8 in

From Gas/Air Supply

3

4

Rear of

Unit

5

1

2

4-6. Electrical Service Guide

Max Recommended Standard Fuse Rating In Amperes

Input Voltage
Input Amperes At Rated Cutting Capacity

Circuit Breaker

1

, Time-Delay

2

Normal Operating

3

UPC 838

380

440

21.6

19.3

30

30

35

35

4

6

10

50

100

150

Min Input/Grounding Conductor Size In mm

2

Max Recommended Input Conductor Length In Meters

Reference: 1999 National Electrical Code (NEC)

1 Choose a circuit breaker with time-current curves comparable to a Time Delay Fuse.
2 “Time-Delay” fuses are UL class “RK5” .
3 “Normal Operating” (general purpose − no intentional delay) fuses are UL class “K5” (up to and including 60 amp), and UL class “H”

( 65 amp and above).

Advertising