Installation and cabling, Overview, Appendix b – McDATA ULTRANETTM EDGE STORAGE ROUTER 3000 User Manual

Page 347

Advertising
background image

B-1

B

Installation and Cabling

This appendix provides installation and cabling information for the
UltraNet Edge 3000.

Overview

The UltraNet Edge 3000 host and network I/O hardware components
have been pre-installed. You are responsible for the following:

•

Review the site-preparation requirements in

Appendix A, Site

Preparation

before installing the UltraNet Edge 3000 hardware.

•

Decide on unit placement.

•

Unpack and inspect the UltraNet Edge 3000 unit.

•

Take an inventory of UltraNet Edge 3000 components.

•

Ensure that ESD procedures are followed, see “Cables and
Equipment” on
page -14.

•

If the UltraNet Edge 3000 is placed in a rack mount, attach
mounting brackets to the front corners of the unit.

•

Mount UltraNet Edge 3000 on the equipment rack (or place in
tabletop position).

•

Acquire and attach the appropriate cable types and lengths.

NOTE:

After hardware installation is complete, use the UltraNet

ConfigManager configuration application to perform your network
configurations.

Advertising