3-6. Electrical Service Guide

60 Hz Three Phase

Input Voltage

460

Input Amperes At Rated Output

39

Max Recommended Standard Fuse Rating In Amperes

1

Time-Delay

2

45

Normal Operating

3

60

Min Input Conductor Size In AWG

4

8

Max Recommended Input Conductor Length In Feet (Meters)

287

(87)

Min Grounding Conductor Size In AWG

4

10

Reference: 2005 National Electrical Code (NEC) (including article 630)

1 Consult factory for circuit breaker applications.
2 “Time-Delay” fuses are UL class “RK5” .

3 “Normal Operating” (general purpose - no intentional delay) fuses are UL class “K5” (up to and including 60 amp), and UL class “H” ( 65 amp and

above).

4 Conductor data in this section specifies conductor size (excluding flexible cord or cable) between the panelboard and the equipment per NEC Table

310.16. If a flexible cord or cable is used, minimum conductor size may increase. See NEC Table 400.5(A) for flexible cord and cable requirements.

SECTION 4 − OPERATION

Ref. ST-801 826-C

4-1. Controls

1

2

3

4

1

Power Adjust Control

Use control to select power between the mini-

mum and maximum output of the power

source. The numbers around the control are in

kilowatts (kW).
2

Remote Power Control Switch

Use switch to select way of controlling unit out-

put.
For front panel control, place switch in Panel

position.

For remote control, place switch in Remote 14

position. Connect controller or pendant control

to Remote 14 receptacle (see Section 3-3).

The remote control functions as a slave to the

front panel Power Adjust control. For example,

if the front panel control is set to 12.5 kW and

the remote control is set to maximum, output

will be 12.5 kW. To obtain maximum output

from the unit using a remote control, the front

panel control must be set to maximum.

3

Power Switch With Indicator Light

Use switch to turn unit, fan motor, and indica-

tor light On and Off.

Unit is ready to heat 10 seconds after Power

switch is placed in On position.

4

Ground Fault Test Switch

Use switch to test ground fault circuitry.

Advertising