Installing the ds4000 storage manager client, Installing, Ds4000 – IBM Partner Pavilion DS4100 User Manual

Page 94: Storage, Manager, Client, Redundant, Power, Connections, Controllers

Advertising
background image

one-half

of

the

current

load.

If

there

is

only

one

power

supply

unit,

it

will

handle

all

of

the

current

load.

To

ensure

maximum

protection

against

power

loss

due

to

power

supply

unit

failure

or

a

power

circuit

tripping,

both

power

supply

units

must

be

connected

and

powered

on.

See

Table

10

on

page

15

for

the

DS4100

AC

power

requirements.

See

Figure

56

for

an

example

of

redundant

power

cabling.

Exception:

The

DS4100

single-controller

storage

server

has

only

one

power

supply,

so

it

does

not

support

power

redundancy.

For

details

about

power

requirements,

see

“DS4100

specifications”

on

page

14.

6.

Go

to

“Turning

the

storage

server

on

and

off”

on

page

65

for

the

initial

startup

of

the

storage

server.

Attention:

Before

you

power

on

the

storage

server,

any

storage

expansion

units

should

be

completely

connected

to

the

storage

server.

Installing

the

DS4000

Storage

Manager

client

Refer

to

the

IBM

TotalStorage

DS4000

Storage

Manager

9.10

Installation

and

Support

Guide

for

the

appropriate

operating

system

for

instructions

on

how

to

install

the

Storage

Manager

software.

Use

that

document

and

the

online

help

to

configure

the

logical

drives,

partitions,

and

so

on

for

the

RAID

controllers.

Use

your

operating

AC distribution unit

power cord

Controller power supplies

Drive expansion unit
power supplies

Rack power cable connector

Rack power cable

AC distribution units

f10ug060

Figure

56.

Redundant

AC

power

connections

to

controllers

and

drive

expansion

units

62

IBM

TotalStorage

DS4100

Storage

Server:

Installation,

User’s,

and

Maintenance

Guide

Advertising