Towers and doors installation – Jacuzzi BY82000 User Manual

Page 10

Advertising
background image

TOWERS AND DOORS INSTALLATION

THESE INSTRUCTIONS ARE FOR SUMMER RAIN
UNITS WITH AND WITHOUT AIR FEATURE OPTION.
REFER TO COMPONENT IDENTIFICATION ON PAGE
4 TO HELP IDENTIFY PARTS.

All wall finish tiling, trim, and sealing should be
completed before beginning this part of the installa-
tion.

STEP 1
Position each tower on mounting pad on base. For the
shower towers, feed hot and cold supply line through
appropriate holes in bottom of tower. For air feature,
feed air line through large hole on bottom cap of the air
tower. Check with a level when attaching towers to base.
Tighten tower base bolts after leveling (1 bolt per shower
tower and 2 bolts for air tower).

WASHER

BOLT (5/16")

COLD

HOT

SHOWER

TOWER (2X)

FLOW

SWITCH

CABLE*

* ONLY WITH AIR TOWER UNITS

WASHER (2)

BOLT 5/16" (2)

AIR SUPPY PIPE

AIR
TOWER

CONTROL
PANEL CABLE

WATER TOWER DETAIL

REAR OF CONTROLLER

BLACK LEAD

STEP 3 (WITH AIR FEATURE ONLY)
Route flow switch cables up through water towers and
connect to flow switch on both shower towers.

FROM
CONTROL
BOX

FLOW
SWITCH

STEP 2 (WITH AIR FEATURE ONLY)
Route control panel cable up through air tower and
connect to control panel.

8

Jacuzzi Whirlpool Bath

©

BY82000 03/05

Advertising