Towers and doors installation – Jacuzzi BY82000 User Manual

Page 14

Advertising
background image

TOWERS AND DOORS INSTALLATION

FINISH WALL

EDGE
OF BASE

GLASS SIDE
PANEL MOUNTED
PARALLEL TO
EDGE OF BASE

WALL POST

TAPE (3)

SCREWS (3)

STEP 9
Position the fixed glass wall post so that the glass side
panel will be parallel with the outside edge of the base.
The fixed glass wall post position may vary slightly due
to the anchored location of the water tower.

STEP 10
Level the post in its proper position and mark where
screw holes are to be drilled. Drill 3/16" holes and secure
with wall anchors and screws provided. Apply tape
(provided) firmly over screw heads.

STEP 11
Slide fixed glass panel all the way into wall post.

12

Jacuzzi Whirlpool Bath

©

BY82000 03/05

Advertising