Machine setup, Client, farm, field, and task setup – John Deere SURFACE WATER PRO OMPFP11362 User Manual

Page 10

Advertising
background image

Machine and Implement Setup

JS56696,00009D2 ­19­19MAY11­1/1

Client, Farm, Field, and Task Setup

This is a required step for boundaries to run survey mode
or to record ditch and levee tracks.

Select MENU softkey >> GREENSTAR 3 PRO softkey >>
RESOURCES/CONDITIONS softkey >> RESOURCES
tab.

The documentation screen allows the setup of operations
and specific details associated with those operations.

IMPORTANT: When setting up the display with

vehicle key in the accessory position (power
on, engine off), turn key to OFF position for
20 seconds BEFORE starting the vehicle.
This ensures the setup data is saved to the
USB flash drive before operating.

If the vehicle is running during setup and
programming, turn off the vehicle with key
in the OFF position and wait 30 seconds
before restarting. This ensures all data is
saved to the USB flash drive.

DO NOT turn the key to the start position directly
from the accessory position. The reduction
in voltage during the starting phase could
result in a loss of all setup data.

Choose the correct information from CLIENT, FARM,
FIELD, and TASK drop­down box or input new information.
Task is required only if Documentation is used. It is not
needed to set or AutoTrac ditch or levee tracks. Always
setting tasks is a good standard practice though.

PC8663 —UN—05AUG05

MENU softkey

PC12685 —UN—14JUL10

GREENSTAR 3 PRO softkey

PC8676 —UN—05AUG05

RESOURCES/CONDITIONS softkey

PC10857BV —UN—15JUL08

Resources tab

15­2

061611

PN=10

Advertising