Spalding 211014 User Manual

Page 21

Advertising
background image

21

03/05

P/N 211014

2.

3.

Remove packaging materials from handle assemblies (P-10 and P-11).

Remove screws on
both sides of tube.

P-11

P-10

P-11

Slide upper tube (P11) onto handle assembly (P-10). Reinsert screws removed in previous step as shown.

P-21

H-24

H-24

H-25

H-25

H-26

H-26

Assemble brackets (P-21) to backboard using bolts (H-25) metal spacers (H-24) and nuts (H-26) as
shown. The spacers may fit very tightly between the brackets and may need to be tapped gently into place
with a hammer.

4.

P-21

Face of Backboard

H-24

H-26

H-25

P-21

Screws removed in step 2

P-10

Rotate upper tube to line up
screw holes. Reinsert screws
removed in previous step as
shown.

NOTE:

Advertising