Important, Warning – Spalding 211014 User Manual

Page 25

Advertising
background image

25

03/05

P/N 211014

H-18

H-15

P-1

P-20

P-19

P-17

P-11

9.

Install handle assembly (P-10 and P-11) to lower elevator tubes (P-19) using bolt (H-18), spacers (H-14),
and nut (H-15) as shown.

P-20

P-19

H-14

H-14

Secure the handle assembly (P-10 & P-11) to pole bracket (P-9) using
bolt (H-30) and nut (H-23) as shown.

10.

P-9

P-7

H-30

H-23

P-10

IMPORTANT!

Note orientation of handle.

Before going on to next step, set
adjustable system assembly to
the 10’ (3.05 m) setting.

NOTE:

TIGHTEN BOLT (H-18) IN
LOCK NUT (H-15) UNTIL
FLUSH (EVEN) WITH LOCK
NUT’S OUTER EDGE.

WARNING!

TIGHTEN BOLT (H-30) IN
LOCK NUT (H-23) UNTIL
FLUSH (EVEN) WITH LOCK
NUT’S OUTER EDGE.

WARNING!

Advertising