Sub-Zero IC-27FI User Manual

Page 11

Advertising
background image

Site Preparation

11

subzero.com/specs

Anti-Tip Bracket Installation

INSTALL CONCRETE WEDGE ANCHORS:

1) Drill a

3

/

8

"

(10)

diameter hole any depth exceeding the

minimum embedment. Clean the hole or continue

drilling additional depth to accommodate drill fines.

Use a carbide drill bit manufactured within ANSI

B94.12-77.

2) Assemble the washer and nut flush with the end of

anchor to protect threads. Drive the anchor through the

material to be fastened until the washer is flush with

the surface material.

3) Expand the anchor by tightening the nut 3–5 turns past

hand-tight position or to 25 foot-pounds of torque.

Always wear safety glasses and use other necessary

protective devices or apparel when installing or

working with anchors.

Anchors are not recommended for use in lightweight

masonry material such as block or brick, or for use in

new concrete which has not had sufficient time to cure.

The use of core drills is not recommended to drill holes

for the anchors.

Uncrate the integrated unit and inspect for any damage.

Remove the wood base and discard the shipping bolts

that hold the wood base to the bottom of the unit. Remove

all packing materials and tape.

The drawers should be removed and placed aside until

you are ready for installation of the panels. Remove the

decorative top and side moldings and the kickplate/grille.

IMPORTANT NOTE:

For drawer models, the top drawer

has a control cable that needs to be disconnected before

removing this drawer. Refer to the illustration below for

placement and how to disconnect this fitting.

Retract the front leveling legs all the way up to allow the

unit to be moved into position more easily. You will extend

the leveling legs when the unit is in its final position to

reduce the possibility of the unit tipping forward.

Use an appliance dolly to move the integrated unit near

the rough opening. Position the dolly at the side of the unit

to prevent damage to finished surfaces.

IMPORTANT NOTE:

If for any reason the integrated unit

has been laid on its back or side, you must allow the unit

to stand upright for a minimum of 24 hours before con-

necting power.

Before moving the integrated unit into position, secure

the door closed, remove drawers and protect any

finished flooring.

Position the Unit

Control cable.

Advertising