Sub-Zero IC-27FI User Manual

Page 21

Advertising
background image

Integrated Installation

21

Installation Checklist

To ensure a safe and proper installation, the following

checklist should be completed by the installer to ensure

that no part of the installation has been overlooked.

INSTALLATION CHECKLIST

Have all packing materials been removed?

Turn the unit on. Is it operating properly?

Is the power cord plugged into a properly grounded

outlet, which has been installed in accordance with all

applicable electrical codes?

For units with an automatic ice maker, is the water

supply line connected and not leaking? Is the water

supply turned on and ice maker control on?

Has the anti-tip bracket been installed securely and

properly engaging the unit?

Is the unit leveled properly with all leveling legs making

contact with the floor? Has the kickplate/grille been

installed?

Are panels attached securely and properly aligned?

Has the door been aligned for proper appearance and

operation?

Does the customer understand the unit's operation?

Does the customer have the warranty package?

Have any installation or service problems been noted

on the product registration card? Has the registration

card been mailed in?

Have stainless steel panels been inspected for any

imperfections? This is to be done by the authorized

Sub-Zero dealer or installer with the customer, upon

completion of installation. Stainless steel panels are

covered by a limited 60-day warranty for cosmetic

defects.

subzero.com/specs

Advertising