Instant on” startup sequence – KVH Industries TracVision L2 User Manual

Page 60

Advertising
background image

E-2

A Guide to TracVision L2

*** Entering Tracking ***

+POS: 61.8 36.5 1260

+POS: 62.2 36.3 1346

+POS: 64.0 36.5 1716

*** Entering Satellite Check *** --------Confirming proper satellite lock

+POS: 64.3 36.1 1747

Satellite Located

IRD Signal Quality = 54

+POS: 66.1 35.6 1522

+POS: 64.6 35.5 1749

IRD Signal Quality = 58

+POS: 66.2 36.1 1467

+POS: 64.5 35.8 1757

“Instant On” Startup Sequence

?PGM

KVH TracVision L2 Rev X - Version X.XX - Serial Number XXXXXXXX

Instant On --------------------------------System skips limit switch test

Limit Switch Status: PASS-----------------PASS is expected

*** Initializing IRD ***

...

IRD STATUS: PASS DSS --------------------PASS is expected with successful IRD

identification

Saved Sat Pos: EL = 33.3

*** Initializing Rate Bias ***

+POS: 360.0 33.9 2625

VEL_INDEX: Az = 1996, El = 2182 ---------Expected range is 1700-2300

RATE BIAS: PASS --------------------------Az & El values above are within valid ranges

*** Initializing Finetune ***-------------Peaking the satellite signal

+POS: 360.0 33.9 2622

Signal Peaked: AZ = 0.00, EL = 33.30, RF = 2674

+POS: 0.0 33.3 2646

+POS: 0.0 33.3 2638

IRD Signal Quality = 79

+POS: 0.0 33.3 2640

+POS: 0.0 33.3 2614

IRD Signal Quality = 77

CH = 200 XP = 7 HI = 0 LO = 10

+POS: 0.0 33.3 2652

Saved Sat Pos: AZ = 0.00, EL = 33.30

+POS: 0.0 33.3 2617

+POS: 0.0 33.3 2616

IRD Signal Quality = 78

+POS: 0.0 33.3 2610

Advertising