6.

Disconnect the D4 diode pigtail from
the positive strap. See Figure F.14.

FIGURE F.14 - Procedure to discon-
nect the D4 diode pigtail from the
positive strap.

7.

Remove the red insulating paint
from the heat sink test points. See
Figure F.15.

FIGURE F.15 - Heat sink test points.

NOTE: DO NOT DISASSEMBLE THE
SCR RECTIFIER HEAT SINK ASSEM-
BLY.

8.

Construct the circuit shown in Figure
F.16. One 6-volt lantern battery can
be used. R1 and R2 resistor values
are 010%. Set voltmeter scale low,
at approximately 0-5 volts or 5-10
volts.

a.

Test the voltage level of the bat-
tery. Short leads (A) and (B).
Close switch SW-1. Battery
voltage should be 4.5 volts or
higher. If lower, replace the bat-
tery.

9.

Connect the Tester to the SCR 1 as
shown in Figure F.16.

a.

Connect Tester lead (A) to the
anode.

b.

Connect Tester lead (C) to the
cathode.

c.

Connect Tester lead (G) to the
gate.

FIGURE F.16 - SCR Tester Circuit and
SCR connections.

ACTIVE SCR RECTIFIER ASSEMBLY TEST (CONTINUED)