Troubleshooting & repair, Scr removal and replacement (continued) – Lincoln Electric IDEALARC CV-300 User Manual

Page 79

Advertising
background image

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Section TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

Retur

n to Master TOC

CLAMPING PROCEDURE FOR
1/4-28 BOLTS.

Note: This procedure can only be used
with 1/4-28 bolts.

Do not use bolts with any other type
thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf
spring will apply the required clamping
force to the SCR.

1.

Do not turn the nuts. While holding
the nuts stationary, turn the cap
screws only with the following pro-
cedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/2 turn.

6.

Tighten first cap screw 1/4 turn.

7.

Assembly now has proper clamping
force.

8.

Perform the

Active SCR Test.

CLAMPING PROCEDURE FOR
1/4-20 BOLTS.

Note: This procedure can only be used
with 1/4-20 bolts.

Do not use bolts with any other type
thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf
spring will apply the required clamping
force to the SCR.

1.

Do not turn the nuts. While holding
the nuts stationary, turn the cap
screws only with the following pro-
cedure.

2.

Tighten first cap screw 1/4 turn.

3.

Tighten second cap screw 1/2 turn.

4.

Tighten first cap screw 1/2 turn.

5.

Tighten second cap screw 1/4 turn.
STOP.

6.

Assembly now has the proper
clamping force.

7.

Perform the

Active SCR Test.

SCR REMOVAL AND REPLACEMENT (CONTINUED)

F-40

TROUBLESHOOTING & REPAIR

F-40

IDEALARC CV-300

Advertising