3.3.2 Unit Handling

If possible, transport the unit using a forklift or pallet jack.

• If using a forklift or pallet jack, ensure that the fork tine length is suitable to safely move the

packaged unit.

• Liebert recommends keeping the unit in the protective packaging until it has been moved to the

installation site.

• When handling and unpacking the unit, exercise great care to prevent damage.
• Do not lift the unit any higher than 6" (152mm) while moving it. If it must be lifted higher than 6"

(152mm), exercise great care and keep all personnel who are not helping move the unit at least 20'

(5m) away from the unit.

• The Liebert XDH ships with four outrigger-style wheels to permit rolling it into position. Liebert

recommends using a forklift or pallet jack to move the Liebert XDH as near as practical to its

installation site before removing it from the shipping pallet.

3.3.3 Unpacking the Unit

1. Remove the exterior stretch-wrap packaging from around the unit, exposing the protective corner

and side packaging planks.

2. Remove the ramp, corner and side packaging planks from the unit, exposing the bag over the unit.

Remove the bag when ready to install the Liebert XDH.

Figure 5

Removing shipping package

Exterior stretch wrapping

surrounds other protec-

tive shipping features

Leave the plastic bag on the unit

until it is off the pallet and ready

to be installed

Planks at the corners and on

the sides protect the Liebert

XDH during shipping

Ramp

(secured to the Liebert XDH by a

layer of shrink-wrap)

NOTE:

One ramp will be shipped per order.

Ramp

(removed from pallet)