Power installation – LG GDK-20W User Manual

Page 20

Advertising
background image

GDK-20W DIGITAL WIRELESS KEY TELEPHONE SYSTEM

22





































Figure 3.3.2 KSU Mounting Holes & Installation layout



Power Installation


The Power Supply Circuit of the MBU provides power for the system boards and telephones, converting the AC Input
Voltage to appropriate DC voltages. Before installation, assure that the AC power cord is NOT plugged into the AC
INLET. The Power Supply Circuit is located on the left upper side of the MBU.
The GDK-20W Power can only operate 220~240V AC based on the connection of the cable(4-wired) by the CN22 from
transformer and the connection of the cable(2-wired) by the CN21 to transformer.

Input Voltage

Connect to

Fuse

230V(+10%, -15%)

CN21

T800mAH 250V


* Caution : the GDK-20W Power can not operate with 110~127V AC.


Advertising
This manual is related to the following products: