GDK-20W DIGITAL WIRELESS KEY TELEPHONE SYSTEM

53

DECT Survey Report Template


-----------------------------------------------------------------------------------------------------------
Number: Date:

From : ..........................................................................

[Engineer doing the survey]

To : ...............................................................................

[LGE Sales Manager]


Copy to:

KOREA

[Always send a copy to LGE, Korea]


z

Site

:

[Full address of site]

z

Execution of survey Engineers :

Survey carried out by:

[Names and addresses of engineers who executed

the survey]

z

Customer engineer(s) :

[Name and address of customer engineer(s)]

z

Date

:

[Date

of

survey]


z

Outline description of site

[Short description of site (dimensions, environment, number and type of buildings, etc.]

z

Number of wireless terminals and expected traffic

[Description of expected traffic and indication of above or below average traffic areas]

z

Test

results.

[This should include the site maps and any additional information that may be useful]

z

Connections WTI ports - base stations

z

Existing

cabling

[Indicate what cabling is available and how it is distributed across the site]

z

Connection of base stations and cable lengths

[List for planned base station approximate cable length, and whether existing wiring can be used or new
cabling is required]

z

Base station installation

[For each base station indicate exactly where it can be installed, e.g. "in the corridor against the wall of room
32, 2.5m high") and whether customer restrictions apply as to where base stations may be installed]

z

Possible

configurations

[List alternative configurations regarding the deployment of base stations. Refer to coverage maps and detail
areas where coverage cannot be guaranteed]