Adjustment – Pfaff 1246 User Manual

Page 56

Advertising
background image

Adjustment

11 - 16

11.

04.14

Thread check spring

Requirement
The movement of thread check spring

2 must be finished when the needle point enters the

material (approx.

7 mm spring path).

Due to technical reasons, the length of the thread-check spring path can vary a
little in either direction.

Fig. 11 - 14

● Thread the machine, place test material under the presser foot and allow the presser

foot to rest on the fabric using the presser foot lifter.

● Loosen screw

1.

● Sew a few stitches by turning the handwheel and then bring the take-up lever to its TDC.
● Continue to turn the handwheel (in its direction of rotation) until the needle enters the

material.

● In this position, bring stop

3 to rest on thread check spring 2 and tighten screw 1.

1

3

2

7 mm

Advertising
This manual is related to the following products: