Assembly steps – Precor 100i User Manual

Page 73

Advertising
background image

100i Commercial AMT Assembly Guide

3

Assembly Steps

Remove the two side fasteners that hold the front frame
tube to the shipping pallet. Cut the tie wraps that secure
the rear base.

CAUTION: Ask for an assistant to help you roll the
AMT off its pallet. Also, do not install the handlebars
at this time. The handlebars provide an alternative
handhold and, during assembly, may cause injury
due to increased foot plate movement.

Lift the rear base and roll the AMT forward while your
assistant stabilizes the front and guides it off the pallet.
Move the AMT to the location where you plan to use it.

Insert the end caps (E) into the front frame tube. Align
the end caps and, if necessary, use a rubber mallet to
secure them in place.

Advertising