Figure 10 – ParaBody 883 User Manual

Page 11

Advertising
background image

11

STEP 10:

FIGURE 10

• Assemble two 3-1/2” PULLEYS (9) to the LEFT BOOM BRACKET (2) using two 3/8 X 1-3/4” BOLTS (13) and two 3/8”

LOW HEIGHT LOCK NUTS (14) as shown in FIGURE 10.

• Screw the long threaded end of the WEIGHT STACK CABLE into the end of the HEAD PLATE (6) .See FIGURE 10.

• Route the WEIGHT STACK CABLE around the pulleys in the LEFT BOOM BRACKET (2) as shown in FIGURE 10. (NOTE:

Make sure the cable runs in the grooves of the pulleys.)

• Assemble the WEIGHT STACK PIN (10) to the HEAD PLATE (6) as shown in FIGURE 10.

14

9

2

WEIGHT

STACK

CABLE

13 3/8 X 1-3/4”

10

6

Advertising