Figure 12, Figure 13 – ParaBody 883 User Manual

Page 13

Advertising
background image

13

STEP 12:

FIGURE 12

Route the new PRESS STACK CABLE (7) thru the PEC STATION as shown. (NOTE: Remove pulleys for ease of installation.)

Slide GUIDE RODS up just enough to get the cable end thru. Push GUIDE RODS down when finished.

STEP 13:

FIGURE 13

• Screw the threaded end of the PRESS STACK

CABLE (7) into the end of the HEAD
PLATE. See FIGURE 13.

• Route the new PRESS STACK CABLE (7)

around the pulleys in the BOOM BRACKET
using the existing bolts as shown in
FIGURE 13. (NOTE: Make sure the cable
runs in the grooves of the pulleys.)

7

BOOM

BRACKET

HEAD

PLATE

7

Advertising