Pre-start up preparations – North Star 27500 User Manual

Page 8

Advertising
background image

7

Dev ice

Running Watts

Air Conditioner (12,000 Btu)

1700 (a)

Battery Charger (20 Amp)

500

Belt Sander (3”)

1000

Chain Saw

1200

Circular Saw (6-1/2”)

900

Coffee Maker

1000

Compressor (1 HP)

2000 (a)

Compressor (3/4 HP)

1800 (a)

Compressor (1/2 HP)

1400 (a)

Curling Iron

700

Dishwasher

1200

Edge Trimmer

500

Electric Nail Gun

1200

Electric Range (one element)

1500

Electric Skillet

1250

Freezer

800 (b)

Furnace Fan (1/3 HP)

1200 (a)

Hair Dryer

1200

Hand Drill (1”)

1100

Hand Drill (1/2”)

875

Hand Drill (3/8”)

500

Hand Drill (1/4”)

250

Hedge Trimmer

450

Home Computer

150

Impact Wrench

500

Jet Pump

800 (a)

Lawn Mower

1200

Light Bulb

100

Microwave Oven

700

Milk Cooler

1100 (a)

Oil Burner on Furnace

300

Oil Fired Space Htr (140,000 Btu)

400

Oil Fired Space Htr (85,000 Btu)

225

Oil Fired Space Htr (30,000 Btu)

150

Oven

4500

Paint Sprayer, Airless (1/3 HP)

600 (a)

Paint Sprayer, Airless (handheld)

150

Radio

200

Refrigerator

600 (b)

Slow Cooker

200

Submersible Pump (1-1/2 HP)

2800 (a)

Submersible Pump (1 HP)

2000 (a)

Submersible Pump (1/2 HP)

1500 (a)

Sump Pump

600 (a)

Table Saw (10”)

2000 (a)

Television

500

Toaster

1000

Vacuum cleaner

250

VCR

70

Water Heater

3000

Weed Trimmer

500

(a) Hard-starting motors require 3 to 5 times the

rated running watts.

(b) These loads may require up to 15 minutes to

restart due to its normal build up of compressor head
pressure.

NOTE: For extremely hard to start loads such as

air conditioners and air compressors, consult the
equipment dealer to determine the maximum wattage.

PRE-START UP PREPARATIONS

Your generator has been thoroughly tested prior to

shipment from the factory. However, damage can
occur during shipping, so be sure to check for
damaged parts, loose or missing nuts and bolts. If the
these problems occur, call Customer Service at 1-800-
270-0810.

GROUNDING - All units must be grounded. Drive

a 3/4” or 1” copper pipe or rod into the ground close to
the generator. The pipe/rod must penetrate moist
earth. Connect an approved ground clamp to the pipe.
Run a 8 gauge wire from the clamp to the generator
ground screw. Do not connect to a water pipe or a
ground used by a radio system.

OPERATING SPEED

The generator must be run at the correct speed in

order to produce the proper electrical voltage and
frequency.

The output voltage should be checked to ensure

the generator is working properly subsequent to
connecting a load to the generator. Failure to do so
could result in damage to equipment plugged into the
unit and possible injury to the individual.

All engines have a tendency to slow down when a

load is applied. When the electrical load is connected
to the generator, the engine is more heavily loaded,
and as a result the speed drops slightly. This slight
decrease in speed, together with the voltage drop
within the generator itself, results in a slightly lower
voltage when the generator is loaded to its full capacity
than when it is running with no load. The slight
variation has no appreciable effect in the operation of
motors, lights and most appliances. Electronic
equipment and clocks will be effected if correct RPM is
not maintained. See Load vs. Output chart

Load

Output

Percent of
Generator

Output

Speed
(RPM)

Frequency

(Hz)

Generator

voltage at 120V

Receptacle

0 %

3780

63.0

125V

50 %

3600

60.0

122V

100 %

3480

58.0

118V

Output voltage should be checked periodically to

ensure continued proper operation of the generating
plant and appliances, it can be checked with a portable
meter. Frequency can be checked by using an electric
clock with a sweep second hand. Timed against a
wrist watch or a stop watch the clock should be correct
within +/- 2 seconds per minute. All speed setting
adjustments should be done by a qualified technician.

Advertising